Pohang Dalian environmental protection equipment Co., Ltd.
Contact (Atten): Chi Manager
Telephone (Tel):0411-39909173
Facsimile (Fax):0411-39572517
Mobile phone (MP):15942618881
Hotline (Tel):4006-011-285
Zip code (Zip):116000
Mailbox (Mail):dlpuxiang@163.com
QQ (qq): 114153000
URL (WWW):www.dlpuxiang.com
www.dlpxhb.com
Address (Add): Jinzhou District, Dalian City, Hongta three Bridge Industrial Zone
Main frame configuration
1, at the bottom of the main frame: 8# GB steel, national standard material, the square at the bottom of the main frame welding is firm and reliable, and make strict antiseptic treatment;
2, the bottom of the auxiliary frame: 40 x 80 galvanized rectangular pipe, thickness is greater than or equal to 3 mm, the national standard material, at the bottom of the auxiliary tube frame welding is firm and reliable and make strict antiseptic treatment;
3, column: 50 x 50 galvanized square pipe, thickness is greater than or equal to 2 mm, the national standard material, main column frame welding should be solid and reliable shall not appear empty solder, leakage phenomenon of welding and make strict antiseptic treatment;
4, the auxiliary wall: 30 * 30 square tube, thickness is greater than or equal to 1.5 mm, the national standard material, the integral welding assembly structure, convenient construction and make strict antiseptic treatment;
5, roof frame: 40*60 galvanized pipe, thickness of 2mm, standard material, roof frame welding accessories. Should meet the requirements of the size of the main frame, the overall structure is firm, and strictly do a good job of anti-corrosion treatment;
6, roof material: fiberglass tile;
7, column: four column using stainless steel angle, the other by thickening aluminum alloy;